PREMIUM INFRASTRUCTURE
ONE-STOP SERVICES
TARGETING LEED® GOLD CERTIFICATION
Scale
Blocks A, B, C, D
Handing over Block C
First Block
Handing over Block B
Second Block
Construction period
86 days elapsed
Groundbreaking: piling for Factory C, infrastructure, WWTP
RC foundations of Factory C completed
Construction start –
Factory D
Handover of clean-water tank & parking house
Factory C site handed over to customer for line installation
Handover of the 1,200 m³ WWTP
Factory B site handed over to customer for line installation
Handover of Factory C
Handover of Factory B
Handover of storm & wastewater drainage
Handover of Factory A
Handover of Factory D – project completion



06 Jul 26 → 24 May 27 · 322 days

13 Jul 26 → 15 Jul 27 · 367 days

29 Aug 26 → 16 Oct 27 · 413 days

15 Oct 26 → 15 Nov 27 · 396 days

03 Aug 26 → 15 Aug 27 · 377 days

30 Sep 26 → 11 Apr 27 · 193 days

22 Jan 27 → 03 Aug 27 · 193 days

30 Oct 26 → 31 May 27 · 213 days

06 Jul 26 → 25 Apr 27 · 293 days

06 Jul 26 → 15 Oct 27 · 466 days

Figures from the Project Management Department report on results for the first 9 months of 2026.

85,000 m2

Up to 6.5m · 17m warehouse areas

Block A, B, C, D

132,000 m2

8639.8 KWP

54 bays - 6 tons

Up to 5 tons/m2

1200 m³/day

2 EVN power source + Solar power
All new. Designed around your operations.



Detailed specifications will be updated. Contact the Kizuna team for the full technical dossier.

8,200 m2

Up to 6.5 m

Ground + 2 levels

25,485 m2

7

2 EVN power source + Solar power

15 bays, 6 tons

2.5 tons/m2

Holland Water Co., Ltd

13,873 m2

Up to 6.5 m

Ground + 2 levels

40,261 m2

8

2 EVN power source + Solar power

12 bays, 6 tons

2.5 tons/m2

Holland Water Co., Ltd

13,930 m2

Up to 6 m

Ground + 2 levels

36,454 m2

13

2 EVN power source + Solar power

16 bays, 6 tons

2.5 tons/m2

Holland Water Co., Ltd

12,368 m2

Up to 17 m

Ground + 2 levels + Basement

39,682 m2

6

2 EVN power source + Solar power

11 bays, 6 tons

Up to 5 tons/m2

Holland Water Co., Ltd
Kizuna Gold is a high-efficiency operational platform for enterprises to establish market presence swiftly, achieve operational excellence, and meet global green compliance standards with confidence.

Fire fighting, alarm, sprinklers/hydrants and acceptance documentation.

Roof installation, load control, waterproofing and LV interface.

Roof installation, load control, waterproofing and LV interface.

Roof installation, load control, waterproofing and LV interface.

Windows, roller doors and fire exits meeting safety and operation requirements.

Windows, roller doors and fire exits meeting safety and operation requirements.

Opening dimensions, power supply, equipment acceptance and operational safety.

New transformer station, cabling, switchboards and power supply acceptance.

Camera infrastructure, coverage control and operational integration.







September 9/2026 – updated 30/09/2026
Take a tour around the workshop area right on your phone or computer.
Let’s talk about your business.
Tell us what you’re looking for, and our team will be happy to help.
Experience Kizuna firsthand. Visit our ready-serviced factories, explore the infrastructure and facilities, and discover how Kizuna can support your manufacturing operations in Vietnam.